Electrical and Plumbing Works
Electrical and plumbing works across Kuala Lumpur and Selangor, covering rewiring, additional points, pipe replacement, leak repair and coordination with the rest of the renovation sequence.
Electrical and plumbing are the trades that are hardest to correct once the finishes are on. The first visit maps what exists: the incoming supply capacity, the consumer unit, which circuit serves which room, the water pressure, and where the stop valve and floor traps are. Older properties frequently need more than additional points — aluminium wiring, an undersized supply, corroded galvanised pipe or a bathroom without a proper trap all tend to surface during that check.
Sequence
Every new or relocated point is listed and priced per point, so the scope is countable rather than estimated. First fix runs before plaster, tiles or ceiling go on: conduits and pipes are routed and fixed, then pressure-tested and the circuits tested. Concealed routes are photographed before closing, because a future repair should not require guesswork. Second fix — switches, sockets, sanitary ware — happens after painting.
What the check often finds
In properties over twenty years old, the usual findings are undersized incoming supply for modern loads, no earth leakage protection on some circuits, pipe joints that were repaired rather than replaced, and floor traps that were tiled over. Each of these affects what can safely be added. Where an unsafe condition is found, it is reported first; adding points to an unsafe installation only hides the problem.
Quotation
The quotation lists point types separately, then concealed route length, then any consumer unit or pipe upgrade. Areas that can only be assessed after opening up are marked as provisional and agreed before the additional work proceeds. Partial scopes are possible — a bathroom re-pipe, a single circuit — provided the existing installation is safe to connect to.
Handover
Test every socket, every switch and every tap. Run water in each outlet and check for leaks at the visible joints after a few minutes, not immediately. Keep the photographs of concealed routes; they are what a future contractor will need. Ask for the record of which circuit feeds which room — it saves hours the next time something trips.
Suitable For
- Older properties with aluminium wiring or low supply capacity
- Renovations adding sockets, lighting circuits or water points
- Owners with recurring leaks or low water pressure
- Kitchen and bathroom upgrades that need pipe relocation
What We Offer
- Supply capacity and circuit check
- Rewiring and new circuit installation
- Additional power, lighting and data points
- Pipe replacement and re-routing
- Leak detection and repair
- Water pressure and trap inspection
- Concealed route photography before closing
Common Renovation Needs
- Whole-unit rewiring
- Additional power and lighting points
- Bathroom and kitchen pipe replacement
- Leak detection and repair
- Consumer unit upgrade
Existing Condition Check
Check supply capacity, circuits, water pressure, pipe material and trap condition.
Point Listing
List every new or relocated point so the scope is countable and priced per point.
First Fix
Route and fix conduits and pipes before plaster, tiles or ceiling go on.
Testing Before Closing
Pressure-test plumbing and test circuits, photograph concealed routes.
Second Fix and Handover
Fit accessories after finishes, test everything and hand over the record.
Frequently Asked Questions
How are electrical works priced?
Per point, so the scope is countable. The quotation lists each point type separately; concealed route length and any consumer unit upgrade are listed as their own items.
Do you do partial work only?
We can take a defined scope, such as a bathroom re-pipe or a single circuit addition, provided the existing installation is safe to connect to. If the check finds an unsafe condition, that has to be resolved first.
Will you break the walls?
Some routing needs chasing, and that is agreed before work starts. Where a route can avoid chasing, we will propose it, but it may change the point positions.