Plaster Ceiling and Partition
Plaster ceiling works across Kuala Lumpur and Selangor, covering flat and cove ceilings, light troughs, access panels and coordination with air-conditioning, wiring and downlight positions.
A ceiling hides the services above it, which is why its layout has to be settled before the frame goes up. The finished height comes first — it is determined by the air-conditioning units, the pipe runs and any structural beam. We mark the height, then locate the fan coil access panels, the downlight positions, the light trough and the wiring drops. Anything that cannot be reached after the boards close gets an access panel, because the alternative is cutting the ceiling open later.
Sequence
Metal framing is fixed at the correct spacing to the slab or to the wall, then plasterboard is screwed, taped and jointed before skimming. Corners and shadow gaps need a straight datum; otherwise the lines read crooked from across the room. Where a beam or a structural drop exists, the design usually works around it rather than hiding it, because boxing out a deep beam lowers the whole room.
Design decisions
Flat ceilings are cheaper, easier to service and read calmer in small rooms. Cove ceilings with concealed lighting add depth but need enough void for the light and the driver, and they collect dust. Light troughs should be sized around the actual fitting rather than guessed. If the room has a ceiling fan, its position and the reinforcement needed should be decided before boarding, not after.
Quotation
The quotation covers framing, boarding, jointing, skimming, access panels and any cove or trough construction. Painting is usually a separate item unless stated. Where air-conditioning installation is by another party, the coordination responsibility is written down — otherwise the ceiling closes before the units are tested.
Handover
Open every access panel and confirm it still closes flush. Check the ceiling under raking light for waviness, and confirm that the downlights sit where agreed rather than where the joists allowed. Small hairline cracks along joints can appear in the first months as the building moves; they are usually cosmetic and filled at the next touch-up.
Suitable For
- Renovations that need to conceal new wiring or air-conditioning
- Owners who want cove lighting or a feature ceiling
- Offices that need a clean ceiling before fit-out
- Owners replacing a sagging or water-stained ceiling
What We Offer
- Finished ceiling height setting
- Metal framing installation
- Plasterboard fixing and jointing
- Cove and light trough construction
- Access panel for air-conditioning units
- Skim coat, sanding and painting
- Downlight and wiring coordination
Common Renovation Needs
- Whole-unit flat plaster ceiling
- Cove ceiling with concealed lighting
- Ceiling replacement after a water leak
- Office ceiling with access panels
- Ceiling and light trough for a feature living area
Height and Layout Marking
Fix the finished ceiling height and mark services, downlights and access panels.
Framing
Install metal framing at the correct spacing, anchored to slab or wall.
Board and Jointing
Fix plasterboard, tape and joint the seams, and prepare for skimming.
Skim and Sand
Apply skim coat, sand flat and check the lines under light.
Paint and Handover
Prime and paint, then confirm access panels open and lights sit as agreed.
Frequently Asked Questions
How much height will the ceiling lose?
It depends on what has to be concealed above it. We measure the air-conditioning and pipe positions first, then confirm the achievable finished height before framing.
Will I be able to service the air-conditioner?
Yes, provided an access panel is included. We mark every concealed unit that needs servicing and confirm the panel positions with you.
Can the existing ceiling be repaired instead of replaced?
Local damage such as a water stain or a small sag can sometimes be cut out and patched. Where the framing has failed or the board is soft across a large area, replacement is usually the more reliable option.