Landed house renovation in Subang Jaya: terrace and semi-detached extensions, rewiring, re-piping, roof work and full-house refurbishment with MBSJ submission guidance.
Structure, roof and drainage come before the design
Most Subang Jaya terraces and semi-detached homes were built between the 1980s and the 2000s, which means the original wiring, plumbing and roof are at or past their expected life. Before designing any extension, the existing structure needs checking: footing condition, whether previous alterations were done with approval, and whether the roof can carry additional load. A rear extension tied into a roof that is already failing simply moves the problem inward.
Bring the original plan if you have it, plus current photos of every elevation and the rear lane. Ask for MBSJ setback and coverage requirements to be confirmed before the sketch is finalised, because those two numbers determine how much floor area the extension can add. In practice, families often discover that the plot coverage limit is the binding constraint, not the budget. Getting that answer first saves redesigning twice.
The order of work matters more here than in a condo. Roof and structural work first, then wiring and plumbing, then wet works and waterproofing, then carpentry, then paint. Reversing that order is how a house ends up with new paint over a wall that later has to be opened for a leaking pipe. Where the family stays during the work, decide which entrance, kitchen and bathroom remain usable, and confirm that the temporary arrangement can survive the wet-works stage.
At handover, check each room against the written scope, test every outlet and tap, run water in the bathrooms and look at the joints after a few minutes, and inspect the extension junction with the original house for seepage. Settlement cracks in the first months are normal and are filled at the next touch-up. Keep the as-built drawings and the photographs of concealed work.