Selangor Landed House Renovation Checklist
Landed house renovation should start with roof, drainage, wall, wiring, plumbing, and dampness checks.
Check the house before design
Roof leaks, drainage issues, wall cracks, old wiring, and floor settlement should be reviewed before choosing finishes.
Include exterior works
External walls, waterproofing, awnings, gates, car porch, and drains can affect the budget as much as interior works.
Phase the work if needed
Handle safety, waterproofing, wiring, plumbing, kitchen, and bathrooms first, then plan cabinets and styling upgrades.